Inside the Barn, Friday's work was mostly fitting architrave, skirting and door handles. It's all looking very neat and finished now.
Today (Saturday) I have done some work in the utility room, installing the kitchen units that I 'saved' from the upstairs kitchen. I'm not quite finished yet, so photo to follow.
This is round the back of the building, and shows the sewer connections from the new bathroom |
This is the front driveway (!!) The brown pipes take surface water to the roadside ditch from a land drain behind the retaining wall and from the guttering downpipes |
No comments:
Post a Comment